Coiling Test Time Study

Myers Design and Manufacturing's coiling heads are designed to save your workers both time and energy. Easily does the job of 2 men or more in half the time. Custom designed to meet just about any need.

MDM conducted a time study for coiling some large mooring lines. The lines were requiring 3-4 men, 15-20 minutes per line to coil by hand and palletize. With the coiling head installed the same lines now only required 2 men 4-5 minutes for the same work. That speaks for itself.

coil3

  • Large horizontal coiling heads for big rope up to 4½
  • Medium horizontal and vertical heads for up to 2"
  • Small horizontal and vertical heads for up to ¾"

Optional power sources available